Collins Electrical Company, Inc. was proud to participate in the 956 KW solar installations at the Sierra College Rocklin, CA location. The project consisted of 3,416 Ying li 260 watt panels for a carport system size of 881 KW and 322 Yingli panels for the roof mount system size of 83.7 Kw. The project commenced on 6/1/2011 and was completed before the new fall semester on 8/15/2011, The scope of work was comprised of a complete Balance of System for the carport and roof mount arrays, 1200’ Medium Voltage AC run, installation of Medium Voltage transformers, distribution gear, inverters, and Customer Interconnection.