For 24 Hour Emergency Services Call 1-833-787-CECI

Manteca Unified School District Solar

Provided the installation of electrical work at (11) MUSD school sites and wind turbine electrical work at (2) MUSD school sites. Furnished and installed all electrical equipment and components as required including but not limited to switch gears.

download-button