Davis Joint USD

ClientDavis Joint USD
LocationDavis, CA
Scope of Work585 KW
Schedule1.5 Months
General ContractorsSolar City
EngineerBlymyer Engineers

Project Summary

Collins Electrical Company, Inc. was proud to participate in the 585 KW solar installations at the Davis Sr. High School, Davis CA location. The project consisted of 2,268 Suniva 260 watt panels for a carport system size of 590 KW. The project commenced on 5/15/2021 and was completed before the new fall semester on 6/30/2012, The scope of work was comprised of a complete Balance of System for the carport arrays, horizontal boring of AC run, installation of distribution gear, inverters, and Customer Interconnection.