For 24 Hour Emergency Services Call 1-833-787-CECI

Blog

Windsor Floatovoltaic Solar System

Project entailed Windsor Floatovoltaic Solar System is a system that will generate power for the Windsor waste reclamation facility, corporate yard, and the geysers pump station, delivering approximately 80 percent of the water reclamation facilities’ power requirements while saving about 30 percent of the cost of existing grid service.

University of the Pacific – John T. Chambers Bldg.

Project entailed new engineering building at an operating private campus, state of the art CNC lab, digital learning lab, faculty offices, emergency backup system, and 16KW-DC solar photo voltaic system. Intense design build coordination between all subs and owner. Project completed with minimal carbon footprint and achieved LEED Gold Certification.      

San Joaquin Delta College Gateway Student Services Bldg.

The “now named” Lawrence & Alma DeRicco Student Services Building will serve as the gateway to the campus in terms of where new students will go to obtain all of the services necessary to become enrolled at the college and where continuing students will go to receive student-support services. This building consolidates all non-instructional student […]

Jackson Rancheria Casino

Remodel and expansion of existing building to include, Tenant improvements, select demolition of existing building elements, including some exterior walls and roof area, expansion to existing building shell with buffet dining/kitchen addition on first floor, private dining room and rooftop deck on mezzanine level.